Dursunbey Dada Small Dam that was planned by ALTER and constructed by the State Hydraulic Works, will revitalize the region with Irrigated Agriculture.
Dursunbey Dada Small Dam that was planned by ALTER and constructed by the State Hydraulic Works, will revitalize the region with Irrigated Agriculture.
The final acceptance of the Akçagüney-Dada Small Dam which was planned by Alter in Dursunbey-Balıkesir; has been made by the State Hydraulic Works.
With the completion of the construction, Akçagüney Dada Small Dam, located in Dursunbey-Balıkesir, with a height of 27.80 m from the foundation and a storage volume of 398,000 m3; serves to irrigate 870 decares of agricultural land in total.