Consultancy Services for preparation of Final Designs of Nevai-Kızıltepe District Sewerage Network and WWTP

  • Financing : Equity Capital
  • Service : Wastewater Treatment
  • Employer : Uzbekistan Suv Ta’Minoti
  • Project Duration : 2021 – on going

In order to provide sewage treatment for Kiziltepe District of Nevai Province of the Republic of Uzbekistan, with 42 km of sewerage network; Stage 1 waste water flow rate of 44,812 m3/day and Stage 2 waste water flow rate of 57.505 m3/day with 42km of sewerage network, Domestic Sewage Treatment Plant and Sewer Lines project was signed on 15 October 2021 between Uzbekistan Suv Ta'Minoti and ALTER. Project studies have started. Within the scope of the project, MBR process will be applied to treat the wastewater of Kızıltepe district, which has a population of 215,000 people in 2041 and a population of 283,000 people in 2056.Mapping and designs studies will be carried out.

Services provided by ALTER;

  • Situation analysis
  • Mapping Studies
  • Design Services
  • Data collection and evaluation
  • Geotechnical investigations
  • Preparation of development plans
  • Conceptual design of all systems
  • Final (detailed) design of all systems
  • Preparation of BoQ and tender documents for works
  • Construction Supervision
  • Acceptance of works and commissioning