Preparation of Planning Report for 3rd Section of Pond and Irrigation in Antalya

  • Financing : Equity Capital
  • Service : Irrigation and Planning
  • Employer : General Directorate for State Hydraulic Works (DSİ)
  • Project Duration : 2014 - 2019

The Project covers the preparation of planning report for 5 pond and irrigation;

  • Antalya Kumluca Erentepe Pond – 430 ha agricultural land irrigation
  • Antalya Serik Akçapınar Pond – 60 ha agricultural land irrigation
  • Antalya Manavgat Kızıldağ Pond – 465 ha agricultural land irrigation
  • Antalya Manavgat Yeniköy Yerköprü Pond – 255 ha agricultural land irrigation
  • Antalya Kaş Çamlıova Pond – 255 ha agricultural land irrigation

Services provided by ALTER

  • Open to irrigated farming of the ponds for which the planning report will be prepared.
  • Studies of Hydrology, soil and drainage, water uses and water rights, agricultural economy and expropriation
  • Search of building materials studies at the planning level and preparation of the report
  • Required Drillings
  • Preparation of Engineering Geology Report according to drill logs to be taken at the planning level
  • Examination of upstream and downstream relations on basin basis with updated hydrological data
  • Obtaining the EIA Document by obtaining the licenses of the borrow pits and preparation of the EIA Report or Project Introduction Files
  • Carrying out alternative studies
  • Carrying out cost studies
  • The construction of all necessary facilities, such as piped irrigation network, pump station, etc. in the project, at the planning level of those deemed appropriate in terms of hydraulic, technical and economic aspects.