Tahtaköprü Dam

  • Financing : Equity Capital
  • Service : Dams and Pons
  • Employer : DSİ 6th Regional Directorate
  • Project Duration : 2010 - 2015

The works carried out for 26.010 hectar area and 2.5 million inhabitants with a target year 2067 covers drinking and industrial water needs determination, meeting the needs for potable water and irrigation through possibilities of energy production, analysis for dams, regulators, tunnels , wells, galleries, irrigation, drainage and overflow plants in order to prevent flood damages and proposing the construction for the ones which are found appropriate for construction in terms of environmental and economical aspects. All energy production alternatives were prepared for all the structures in the region.